Productivity and Efficiency

With System BOA® you will achieve higher productivity and efficiency. In a comparative test under identical conditions  6 minutes stuffing time  were required for 1 hank, which is 90 m.

Stuffing with System BOA®
During the same production with System BOA® the stuffing time for 5 18 meter tubes - equivalent to exactly 90 meters - was reduced to  only 3 minutes .

An increase rate in productivity of up to  100 %  is possible!